Friday, July 22, 2011

The December Project Revisited in July

It must be a cold day in July... The guys came to work on the remaining portion of the Winter /December Project.


The work is being done on the bay window area between floors on the north side of the house.
It was previously covered with cedar shakes.
Insulating foam board was applied over the Tyvek over the plywood to gain additional insulation value in this area.Aluminum flashing was installed over the foam board.

The new shakes are made of the same material as the new siding (Hardie "cement board"), however, 5/16" thick vs the 5/8" thick siding. This difference in thickness allowed us to use the additional 3/4" insulating foam board in this area.





We had hoped they would finish this area in one day, but the 96 degree heat definitely affected the outcome.

So, the Winter Project continues... Stay tuned for future updates.

Thanks for visiting the Americus Garden Inn blog. We'd love to see you in person. Maybe in the fall? Remember, the Plains Peanut Festival is in September and the Andersonville Historic Fair is in October.

Wednesday, March 9, 2011

December Project; Lights go off and back on

We ended the previous day with our main electrical service being disconnected so that we could do the necessary work behind the panel boxes. This photo shows the start of the following day. Remember to click the photos for a larger view.By midday the band board, drip rail, bead board, window trim and a fair amount of siding had been installed.

Siding work continued after lunch with the goal being to get high enough to enable the attachment of the mast for the electrical service wires.
During this process, work began on reassembling the electrical meter panel and the wire feeds to the two 200 amp panel boxes.

Work continued above during electrical reassembly. We should have worn our hard hats. Thank goodness there were no mishaps.


The electrical mast was put into position and was secured on top of the new siding.

Siding was nearly complete at day's end.

A closer view.


The City Building Inspector approved our reassembly of the panel boxes and we waited for Georgia Power to return to reconnect us.


Georgia Power, thankfully, arrived and reconnected us as evidenced by the wires going to the electrical mast. Extreme caution was observed while doing touch-up painting.

Due to weather issues, guests and lack of materials, the work has been delayed for a few days. We will continue sharing the progress as it continues.
Thanks for visiting the Americus Garden Inn blog. This post was written by Kim.

Monday, February 28, 2011

December/January/February Project Goes into March

Today has been a stressful day at the Americus Garden Inn. In order for the siding to be removed from the exterior of the Veranda Suite, the electricity to the house needed to be disconnected so the electric receptacles could be safely moved. This is how we started the day. But, it was very damp and cloudy (sunny off and on) and looked like it might rain any second. Remember to click the photos for a larger view. Do you see where the electric connects to the two boxes (shown above) through the tube and across the low roof to the pole?
They started removing the old siding while we waited for Georgia Power to disconnect the electric.

When the guys are in demolition mode, things usually go pretty fast.

Georgia Power arrived.

He clipped the electric cables to the house.

Work started immediately on removing the electric boxes as we did not want the electricity to be off for too long.

The men continued to remove the old siding.
At around noon, this is how far the work has progressed.

The new insulation was installed.

The area was wrapped in Tyvek.

That is as far as they got.

It is a good thing that we do not have anyone staying with us tonight or tomorrow as there is no electricity in the house. Of course, that would be a more authentic 1847 experience...

Thanks for visiting the Americus Garden Inn B&B blog and following along with our project. When it is all done, we will be so happy!

Saturday, February 26, 2011

December/January/February Project Continues

Another beautiful morning here at the Americus Garden Inn. While I am waiting for guests to come in for breakfast, here is a recap of the latest progress on the renovation project. As of Monday afternoon, the siding above the kitchen window was at this point.
As we had guests through the week, the hours the men could work were limited. But, by Thursday, the beadboard was installed on the north side of the house. This had to be special ordered to match the exact dimensions of the original.
Kim had prepainted the siding and while the ladders were still in place, he was touching up the paint after it was installed.
While Kim was using the ladders, the work on the beadboard continued at the lower level.

Besides the touchup work, Kim also did some caulking.

It's a good thing he does not have a problem with heights!

That is about where we are today. You can see that the band of beadboard below the siding has been finished. Monday, weather permitting, the last major section will be done. I'll keep you posted.
Thanks for your virtual visit to the Americus Garden Inn. Visit again soon.

Thursday, February 17, 2011

Americus Garden Inn December-Winter-almost Spring Project

Look what I found in the garden today - the first daffodil of the year. That means that the December/Winter project my become the spring project...Here are the latest photos of the renovation project taken in the last couple of days. Remember to click the photos for a better view. The window trim on the Magnolia Suite is being completed.
The gable on the south side of the house has all of the siding removed. Can you tell how tall our house really is?

Siding on the gable has been replaced and the trim is being installed.

Kitchen window has been removed and this is the view from the inside.

This is the view from the outside.


The kitchen window is being installed.

The two men were trying to synchronize their hammering...

Once the window was set, the work started on the siding.


This is where we are as of this afternoon.

They finished the trim work on the gable, and moved the ladders to the other side of the house.

As I was taking the last two photos, I found more evidence of spring. Can you believe it was 75 degrees today?

Thank you for allowing me to share the latest photos of the Americus Garden Inn Bed and Breakfast. We hope to see you soon. Have a great day.